Projects

Projects - page 5

Supply, Fabrication, Inspection and Testing, Surface preparation and painting of Spud cans
Supply, Fabrication, Inspection and Testing, Surface preparation and painting of Spud cans

Description: Scope - Supply, Fabrication, Inspection and Testing, Surface preparation and painting of Spud cans including Jet Piping for Pandan 4504.

Status: Completed.

Fabrication & painting of Steel Tubular Pipes for MUGHARRAQ PORT – MARINE DEVELOPMENT
Fabrication & painting of Steel Tubular Pipes for MUGHARRAQ PORT – MARINE DEVELOPMENT

Description: Scope - Fabrication of 1370mm Dia x 20mm Thk x 21.1 mtr Long Tubular Piles 175 nos & Welding of C9 Interlocks 2 nos on each Pile Pipe.

Location: Abu Dhabi.

Status: Completed.

Fabrication of Mud Tank system
Fabrication of Mud Tank system

Description: Scope - Supply, Fabrication of Mud system ME#32, ME#34 - Tank.

Status: Completed 2020.

Fabrication & painting of Steel Tubular Pipes for HAIL AND GHASHA ARTIFICIAL ISLANDS CONSTRUCTION PROJECT
Fabrication & painting of Steel Tubular Pipes for HAIL AND GHASHA ARTIFICIAL ISLANDS CONSTRUCTION PROJECT

Description: Scope - Supply, Fabrication, Inspection, Surface preparation and Painting of steel tubular piles.

Status: Completed.

Fabrication, Inspection & Testing, Surface preparation and Painting of Flag Poles (50 m) – 2 Nos
Fabrication, Inspection & Testing, Surface preparation and Painting of Flag Poles (50 m) – 2 Nos

Description: Scope - Supply, Fabrication, Inspection & Testing, Surface preparation and Painting of Flag Poles (50 m) – 2 Nos.

Location: UAE.

Status: Completed.

Fabrication & Site Installation of A380 FIRE TRAINING SIMULATOR
Fabrication & Site Installation of A380 FIRE TRAINING SIMULATOR

Description: Scope - Supply, Fabrication, Inspection, Surface preparation, Painting and installation of simulator at Dubai Airport.

Location: Dubai Airport.

Status: Completed 2019.

Fabrication of 2 x units of Multiport M600-30-SF-LV-HHW15 for SOHAR FLOUR MILLS LLC
Fabrication of 2 x units of Multiport M600-30-SF-LV-HHW15 for SOHAR FLOUR MILLS LLC

Project contract Weight: 273 Tons.

Description: Scope- Fabrication of 2 x units of Multiport M600-30-SF-LV-HHW15.

Location:  Sohar, Oman.

Status: Completed Sep 2020.

Hoping Power Bucket Elevator
Hoping Power Bucket Elevator

Project contract Weight: 360 Tons.

Description: Scope - Material Supply, Fabrication, Installation & testing of free issued hydraulic components, E&I components and other works.

Location: Taiwan.

Status: Completed 2020.

Top